Production Blog September 13, 2011

Edmonton Opera Blog

Production Blog September 13, 2011

Saturday morning the trucks unload at the Jube and in goes the scenery for Cav/Pag! It’s always an adventure to get the set together. It was so long ago that the trailers were loaded , so once everything is pulled out, it is like a giant puzzle to familiarize oneself with all the pieces, sort things out and get everyone working to put it all together. I am always amazed at the co-ordinated teamwork with our TD (Clayton) and the IATSE crew (25+ members) – while lights are being swapped out or changed onstage, the trailers are being unloaded around them and side-stage, bits and pieces of the set are being constructed, the wardrobe crates are being moved into place, the costume maintenance shop is being created – all with a sense of purpose and genuine calmness. Incredible that it all happens in such a short time. With this set – we will have most of the scenery together the first day and a half (within 16 hours) – ready to be lit and be inhabited by the singers for Monday night rehearsal onstage.

It could be chaos at any moment – but because I am in charge of getting donuts for coffee breaks – we avoid any calamities. It’s all good!

Trackbacks

    No Trackbacks

Comments

Display comments as (Linear | Threaded)

    No comments


Add Comment


Enclosing asterisks marks text as bold (*word*), underscore are made via _word_.
Standard emoticons like :-) and ;-) are converted to images.
E-Mail addresses will not be displayed and will only be used for E-Mail notifications.

To prevent automated Bots from commentspamming, please enter the string you see in the image below in the appropriate input box. Your comment will only be submitted if the strings match. Please ensure that your browser supports and accepts cookies, or your comment cannot be verified correctly.
CAPTCHA

 
Submitted comments will be subject to moderation before being displayed.